info@ltsthink.com Alzahraa District, Jeddah Sun–Thu · 9–5
Follow:
ERP & CRM Manufacturing
ERP / MES · Manufacturing

Manufacturing ERP & MES software in Saudi Arabia.

From shop floor to top floor. A custom ERP/MES for Saudi manufacturers — production planning, real-time shop-floor execution, maintenance (CMMS) and quality (QMS) in one platform that lifts OEE and keeps every line running.

Real-time MES ZATCA e-invoicing Arabic / English
Line 2 — Filling & PackingPlant · Jeddah Industrial City
Running
78%OEE
OVERALL EQUIP. EFF.
Output today
18,420 u +6%
Downtime
42 min -12%
Work orders · liveshift A
Filling
88%
Capping
72%
Labelling
54%
Packing
30%
Preventive maintenance dueMixer #3 · in 4 running hours
CMMS
OEE this week
78% ▲
First-pass yield
96.4% ▲
Production planningMESMaintenance (CMMS)Quality (QMS)InventoryBOM & routingProcurementTraceabilityOEEZATCAAnalyticsProduction planningMESMaintenance (CMMS)Quality (QMS)InventoryBOM & routingProcurementTraceabilityOEEZATCAAnalytics
Why a custom build

Stop running the plant on guesswork.

Without it

  • Production planned on whiteboards & Excel
  • No live view of OEE or downtime
  • Breakdowns fixed reactively, not prevented
  • Quality checks on paper, lost in files
  • Stock & BOM never quite match
  • Management blind until month-end

With LtsThink

  • Plan & schedule every work order centrally
  • Live OEE, output & downtime per line
  • Preventive maintenance scheduled by CMMS
  • Digital quality checks & full traceability
  • Real-time inventory tied to BOM & routing
  • Live plant dashboards for management
Built for the factory

Manufacturing ERP modules: MRP, MES, CMMS & QMS.

Production planning

Master scheduling, work orders and capacity planning across lines.

MES execution

Real-time shop-floor data, machine status and live OEE tracking.

Maintenance (CMMS)

Preventive schedules, work requests, spare parts and asset history.

Quality (QMS)

Inspections, non-conformance, CAPA and full batch traceability.

Inventory & warehouse

Raw materials, WIP and finished goods with barcodes & lots.

BOM & routing

Multi-level bills of material, versions and process routings.

Procurement & supply

Purchase planning, suppliers, receiving and landed cost.

Traceability

Track every lot and serial from raw material to dispatch.

Analytics & reports

Live production, cost, OEE and quality dashboards.

Saudi-ready

Built for Saudi factories: Industry 4.0 on your floor.

Built for how Saudi industry runs — connect machines and PLCs, capture data in real time, stay ZATCA-compliant and give every shift Arabic-first tools they’ll actually use.

Machine & PLCConnect equipment & capture data live.
ZATCA Phase 2Compliant e-invoicing built in.
OEE & downtimeMeasure and lift line efficiency.
Arabic-firstBilingual shop-floor terminals.
MRP
Material planning & production costing
MES
Live shop-floor execution & OEE
CMMS + QMS
Maintenance and quality in one system
AR / EN
Arabic-first, ZATCA Phase 2 invoicing
Planning & costing

Production planning, MRP and costing.

Material requirements planning (MRP) starts from what you have to deliver — confirmed sales orders and the forecast — and works backwards through each bill of materials. It nets off what is already in stock or on order, then tells purchasing what to buy and when, and tells the planner which work orders to release. In a Saudi plant that often means long lead times on imported inputs, so the plan has to look weeks ahead, not days.

Costing is where most factories lose sight of their margin. When cost is calculated once a year in a spreadsheet, nobody sees that one product has quietly become unprofitable. A manufacturing ERP keeps both numbers side by side:

  • Standard cost per item, built up from the BOM, routing and labour rates
  • Actual cost per work order — materials issued, machine and labour time recorded
  • Overhead allocated by machine hour, labour hour or output
  • Scrap and waste recorded at the step where they happen
  • Planned vs actual variance on every order, posted to the general ledger

Because every work order posts to the same ledger as sales and purchasing, the month-end close stops being a reconstruction exercise — and ZATCA-compliant invoices come from the same system that knows what each order cost.

Fit by plant type

ERP for the way your plant produces.

The right setup depends less on your sector than on how you produce. Most Saudi factories fall into one of three patterns — and many run two of them under one roof.

Discrete & assembly

Metal fabrication, furniture, equipment and assembled products: multi-level BOMs, routings across work centres, serial numbers where they matter, and make-to-order or make-to-stock planning.

Batch & recipe

Food, beverages, cosmetics, chemicals and plastics: formulas with scalable quantities, batch numbers, expiry dates, quality checks before release, and by-products.

Building materials & high volume

Concrete, block, pipes, packaging and other high-volume lines: shift-based output, machine downtime, raw-material consumption by weight, and delivery scheduling to sites.

ERP vs MES

ERP or MES — what does each do?

They are often sold as rivals. In a well-run plant they are two halves of one system: ERP plans and accounts for production, MES runs it on the floor and reports back what really happened.

ERPMES
Question it answersWhat should we make, with what, and what did it cost?What is happening on this line, right now?
Time scaleDays, weeks, the month-end closeMinutes and shifts
Typical recordsSales orders, purchase orders, BOMs, stock, invoices, payrollWork-order steps, machine status, downtime reasons, quantities produced, quality checks
Main usersPlanning, purchasing, finance, managementSupervisors, operators, maintenance and quality teams

Where to start: if planning, stock and costing still live in spreadsheets, start with ERP — machine data is far more useful once there are work orders to attach it to. If those are already under control and the question is why lines stop, add MES next.

Traceability

Traceability from raw material to dispatch.

When a customer complains or a supplier recalls a raw material, the question is always the same: which batches are affected, and where did they go? Answering it from paper records takes days. Answering it from the system takes minutes — provided lots are recorded at every step:

  • Raw-material lots captured at receiving, with supplier and certificate
  • Each lot consumed against a specific work order and batch
  • Finished-goods batch numbers and expiry dates printed on labels
  • Backward trace: which inputs went into this batch
  • Forward trace: which customers received this batch — the basis of any recall

For regulated products — food, cosmetics, pharmaceuticals — the exact data you must keep and report depends on your regulator and product category. We map the system to the requirements you already work under rather than to a generic template, and confirm them with your quality team before go-live.

How we roll it out

Live without stopping the line.

1

Discover

We map your production & quality flow.

2

Configure

BOMs, routings & work centers set up.

3

Connect

Machines, PLCs & devices integrated.

4

Train

Operators & planners onboarded.

5

Go-live

Launch line-by-line, no big-bang.

FAQ

Common questions.

Does it cover production, BOM and shop-floor (MES)?

Yes — bills of materials, work orders, production planning and real-time shop-floor tracking are all built in, linked to inventory and costing.

Is it ZATCA e-invoicing ready and bilingual?

Yes — ZATCA Phase-2 invoicing with full Arabic and English across documents and the interface.

Can it connect to machines, barcodes and scales?

Yes — barcode/QR, label printing and machine or device integrations keep the shop floor paperless.

What is the difference between ERP and MES?

ERP plans and accounts for production — orders, materials, stock, cost and invoicing. MES runs production on the floor — work-order steps, machine status, downtime and quality checks — and reports actual quantities back to the ERP. Most plants start with ERP and add MES once planning and costing are under control.

Does it handle batch and recipe manufacturing?

Yes — formulas with scalable quantities, batch numbers, expiry dates and quality release before stock can be sold, alongside multi-level BOMs for discrete and assembly work.

How is product cost calculated?

A standard cost is built from the BOM, routing and labour rates; each work order then records actual materials, time and scrap, and overhead is allocated by machine hour, labour hour or output. The variance between the two is visible per order and posts to the ledger.

How long does implementation take?

Most plants go live in eight to fourteen weeks depending on the number of lines, integrations and data migration.

Which cities in Saudi Arabia do you serve?

We deploy for manufacturers in Jeddah, Riyadh, Makkah, Madinah, Dammam and Khobar — across the Kingdom, in Arabic and English, both remotely and on-site.

Let’s think

One platform from raw material to dispatch.

Book a demo and we’ll map your production flow — planning, execution, maintenance and quality — and scope an ERP/MES built around your plant.

  • A free demo and a written scope — no obligation
  • Reply within one business day
  • ZATCA e-invoicing, GOSI and WPS handled from day one
  • Arabic & English team, Arabic-first interface

Book a free demo

Tell us how you run today — we reply within one business day.

Please enter your name.
Enter a valid phone.
Enter a valid email.
Confidential. No spam. or WhatsApp us

Thanks — got it!

We’ll be in touch within one business day.

Chat now on WhatsApp