From shop floor to top floor. A custom ERP/MES for Saudi manufacturers — production planning, real-time shop-floor execution, maintenance (CMMS) and quality (QMS) in one platform that lifts OEE and keeps every line running.
Master scheduling, work orders and capacity planning across lines.
Real-time shop-floor data, machine status and live OEE tracking.
Preventive schedules, work requests, spare parts and asset history.
Inspections, non-conformance, CAPA and full batch traceability.
Raw materials, WIP and finished goods with barcodes & lots.
Multi-level bills of material, versions and process routings.
Purchase planning, suppliers, receiving and landed cost.
Track every lot and serial from raw material to dispatch.
Live production, cost, OEE and quality dashboards.
Built for how Saudi industry runs — connect machines and PLCs, capture data in real time, stay ZATCA-compliant and give every shift Arabic-first tools they’ll actually use.
Material requirements planning (MRP) starts from what you have to deliver — confirmed sales orders and the forecast — and works backwards through each bill of materials. It nets off what is already in stock or on order, then tells purchasing what to buy and when, and tells the planner which work orders to release. In a Saudi plant that often means long lead times on imported inputs, so the plan has to look weeks ahead, not days.
Costing is where most factories lose sight of their margin. When cost is calculated once a year in a spreadsheet, nobody sees that one product has quietly become unprofitable. A manufacturing ERP keeps both numbers side by side:
Because every work order posts to the same ledger as sales and purchasing, the month-end close stops being a reconstruction exercise — and ZATCA-compliant invoices come from the same system that knows what each order cost.
The right setup depends less on your sector than on how you produce. Most Saudi factories fall into one of three patterns — and many run two of them under one roof.
Metal fabrication, furniture, equipment and assembled products: multi-level BOMs, routings across work centres, serial numbers where they matter, and make-to-order or make-to-stock planning.
Food, beverages, cosmetics, chemicals and plastics: formulas with scalable quantities, batch numbers, expiry dates, quality checks before release, and by-products.
Concrete, block, pipes, packaging and other high-volume lines: shift-based output, machine downtime, raw-material consumption by weight, and delivery scheduling to sites.
They are often sold as rivals. In a well-run plant they are two halves of one system: ERP plans and accounts for production, MES runs it on the floor and reports back what really happened.
Where to start: if planning, stock and costing still live in spreadsheets, start with ERP — machine data is far more useful once there are work orders to attach it to. If those are already under control and the question is why lines stop, add MES next.
When a customer complains or a supplier recalls a raw material, the question is always the same: which batches are affected, and where did they go? Answering it from paper records takes days. Answering it from the system takes minutes — provided lots are recorded at every step:
For regulated products — food, cosmetics, pharmaceuticals — the exact data you must keep and report depends on your regulator and product category. We map the system to the requirements you already work under rather than to a generic template, and confirm them with your quality team before go-live.
We map your production & quality flow.
BOMs, routings & work centers set up.
Machines, PLCs & devices integrated.
Operators & planners onboarded.
Launch line-by-line, no big-bang.
Yes — bills of materials, work orders, production planning and real-time shop-floor tracking are all built in, linked to inventory and costing.
Yes — ZATCA Phase-2 invoicing with full Arabic and English across documents and the interface.
Yes — barcode/QR, label printing and machine or device integrations keep the shop floor paperless.
ERP plans and accounts for production — orders, materials, stock, cost and invoicing. MES runs production on the floor — work-order steps, machine status, downtime and quality checks — and reports actual quantities back to the ERP. Most plants start with ERP and add MES once planning and costing are under control.
Yes — formulas with scalable quantities, batch numbers, expiry dates and quality release before stock can be sold, alongside multi-level BOMs for discrete and assembly work.
A standard cost is built from the BOM, routing and labour rates; each work order then records actual materials, time and scrap, and overhead is allocated by machine hour, labour hour or output. The variance between the two is visible per order and posts to the ledger.
Most plants go live in eight to fourteen weeks depending on the number of lines, integrations and data migration.
We deploy for manufacturers in Jeddah, Riyadh, Makkah, Madinah, Dammam and Khobar — across the Kingdom, in Arabic and English, both remotely and on-site.
Book a demo and we’ll map your production flow — planning, execution, maintenance and quality — and scope an ERP/MES built around your plant.
Tell us how you run today — we reply within one business day.